Description
2004-2004
1 Month
36" inch
Northern Alberta

- Summer 2004
- 24-inch steel
- Scope of project: Single 24-inch pipeline loop running from north of Wandering River, Alberta to north of Waskateanu, Alberta. Additionally, a second loop was completed from Fort Saskatchewan to NE Edmonton. Both loops were worked on simultaneously. There was multiple hotlines, road, highway, railroad, and existing facilities crossed on this project.
PAST PROJECTS

Corridor Pipeline
2003-2004
Fort McMurray Alberta, to Edmonton Alberta
2 Years
30 inch

Enbridge - Alberta Clipper
2008-2009
Hardisty, Alberta to Manitoba Border
1 Year
36 inch

TC Energy - McLeod River
2017-2017
Edson Alberta
1 Year
48-inch