Description

2020-2020

1 Year

48-inch

Edson Alberta


TC Energy – North Central Corridor Loop

  • Winter 2020
  • 48-inch steel
  • Scope of project: Single 48-inch pipeline, crossing existing highway utilizing a HBD walkover methodology.

PAST PROJECTS

Corridor Pipeline

Corridor Pipeline

2003-2004

Fort McMurray Alberta, to Edmonton Alberta

2 Years

30 inch

VIEW PROJECT
Alberta Oil Sands

Alberta Oil Sands

2004-2004

Northern Alberta

1 Month

36" inch

VIEW PROJECT
Enbridge - Alberta Clipper

Enbridge - Alberta Clipper

2008-2009

Hardisty, Alberta to Manitoba Border

1 Year

36 inch

VIEW PROJECT