Jay-Nart Directional Drilling Ltd. provides sevices for the following fields:
Ongoing. Completed multiple crossings of NPS 36 with various lengths.
Edson area.
Cheecham Corridor Relocation Project - 2020
Line 36 - NPS 10 & Line 37 - NPS 12
Completed multiple crossings of both NPS 10 and NPS 12 with various lengths.
Anzac area.
Wolf Carbon Solutions - ACTL - 2019
Completed multiple crossings of NPS 16 with various lengths.
Central Alberta area.
North Montney Pipeline Project - 2019
Completed multiple crossings of NPS 42. Crossing lengths varied.
Fort St. John area to Chetwynd area in British Columbia .
Enbridge Line 3R Project - 2016 - 2018
Completed multiple crossings of NPS 36 with various lengths of crossings.
Rosetown, Saskatchewan to Winnepeg, Manitoba.
4” DR11 HDPE and 3” DR11 HDPE
Mainline and services drilled in at engineered and surveyed depths.